03.07.15 Counter tops and cabinets, finished – FINALLY, door knobs, decorative support

10347163_653517461420721_8854790786897803348_nSaturday, March 7, 2015 – FINALLY the counter tops and cabinets are finished being installed and we are happy with them.  The crown molding was installed today and the door that was hinged on the right is now hinged on the left.  We’ve paid them in full and are happy to have that behind us.  This was the only part of the construction part where we chose who to buy from, all the rest were Ronnie’s usual subcontractors.  This was the only part that we had problems with.  The end result we’re happy with, just getting them to correct all the things they did wrong, along with them NEVER, not once, showing up when they were suppose to, added to a huge communication barrier because of them being Chinese and not speaking much English, was a PAIN!

20150307_173418 20150307_173451Roy installed the decorative wood supports under the breakfast bar.  After finding out that the studs weren’t where the original pictures showed they were, Roy made some adjustments to get them spaced properly.  This is something that I did a lot of research to see what I’d like it to look like and I think what Roy came up with is perfect. The molding behind them is not painted yet.

20150307_163746He also installed most of the door knobs today.  They are not exciting to look at so I’ll just show a couple!

20150307_163830 20150307_163846I swept the house out again, took boxes to our burn pile and washed out the tubs (love the running water).  There is972257_10152339361507851_8272374854981013667_n a good bit of sheet rock mud stuck to the tubs but that will wait until we have lights and I can see better what I’m doing.    Monday I’ll be spending a good bit of time giving the wall corners and around the door baseboards a good cleaning so that all of the paper bits are up and any construction dust is cleaned away before the floor is sealed.

Roy still has the inside of the medicine cabinets to put together, window screens to install, bathroom towel holders and rings to install and the last of the door knobs.  I think he has more than that but he’s off to burn the last couple of days trash pile so I can’t ask!

Ya’ll come back now, ya’ hear!

blessed sundy psalm 75 1

cooltext1838781539

Click on the links below to go there!

Wacky Wonderful Wednesdays published on Wednesdays

Some Things I Learned About Alzheimer’s published on Fridays

 

03.06.15 Counter tops, stained concrete floors, plumbing and closet shelves!

1460959_706920356015238_2028737586_nI got exhausted just writing in the title all the things happening today!  It still near freezing today in Southern Louisiana!  There was ice all over the yard this morning but the sun is shining so it feels nice now.

Roy and I ate at La Caretta Mexican restaurant in Amite last night where we enjoyed their delicious cuisine and really enjoyed their live music playing oldies all evening.  Lots of fun and good food made for a wonderful evening out!

Friday, March 6, 2015 – The counter tops guys did not have the cabinet crown molding on their truck. We also didn’t like how they did one piece of quarter molding at the base of the cabinets.  They are 1484218_10151983538281704_859739670_nsuppose to bring those and install them in the next couple of days.

The counter tops were finished yesterday and holes drilled for the faucets and soap dispenser. The pictures were taken after yesterday’s blog post but before they wrapped up their work.  We LOVE the counter tops and how they look!  Only thing better would have been if they were free!

20150305_172241 Okay, all of the above was written yesterday evening.

10418988_812940532097154_4341906263297070402_n
Ha Ha No need for that today!

Today brought with it a slew of issues.   One cabinet hinges on the wrong side causing the door to open into the edge of the microwave.  There was no wood under the counter top over the dishwasher for the plumber to attach the dishwasher to.  The back splash  behind the sink is cracked.  Not where a seam would be, but a real crack.   they attempted to fix it but made it look worse so it was not acceptable. Underneath the front of the bar is a real rough chipped out.  We learned that trying to talk to Chinese workers is like talking to a brick wall, so the store rep is coming out today to see it all and discuss corrections to all the issues. Thank goodness we’ve only paid for half of their total.  At least we’ll have that remaining amount to get them to fix everything and make it right.

The counter top guys drilled four holes for the faucet and soap dispenser behind the sink.  When our wonderful plumber Chris Wrinkles set the faucet set up in the space, the handle turning it on and off banged into the bar top edge.  The best option was to install it without the piece on the bottom so he could adjust where the handle so it doesn’t hit the bar top edge.  10345759_789278814424137_3185991251744409715_nHowever, this makes two unnecessary holes show up.  After much discussion Chris worked with Rachel at Coburn’s (great lady, great company) to come up with a different faucet.  After a couple of calls and text messages about options we chose one that will work.   We ordered the new one.  It will be here Monday and Chris will come back to install it then.  Just a bump in the road, but on top of the other issues this morning it kind of put a damper on the day.  If you have plumbing needs, Chris Wrinkles is the guy to call!

I can’t tell you how smoothly this construction has gone so far with hardly any problems.  I think that trend ended!

We now have toilets installed, tub fixtures installed and running water in the tubs and toilets now.  Yeah for running water – the porta potty can go and will be picked up Monday!!!!!

20150306_125759 20150306_125812 20150306_125826Our stained concrete guys removed the covering from the floor this morning.  We still can’t tell what it will look like since it’s not sealed and lots of dust remains even after a good sweeping. It’s nice to be able to look at flooring instead

of paper covering now.

20150306_130124 20150306_12594320150306_113128Roy purchased decorative supports for under the breakfast bar.

The counter top/cabinet workers came back this afternoon to correct all the problems which included replacing the entire back splash behind the sink under the breakfast bar.  They also smoothed out some rough spots in different places and added a strip of wood for the dishwasher to be screwed into. They ran out of time so they didn’t install the trim or change the door around.

20150306_125645Our closet man, Martin Balisteri with Quality Closets Design and Installation) met with us with us chosing what we wanted for each closet, linen closet, pantry and laundry room.   He had lots of options available and he carries his inventory with him as you can see from one of the pictures.  He did his work very efficiently, left no trash (very important to me) and wrapped it up in no time at all.  Plus his price was right.  I highly recommend any one needing this to give Martin a call.

20150306_133251 20150306_133209 20150307_094920 After realizing the decorative bars Roy got for under the breakfast bar were too big we made another trip to Lowe’s in Hammond to purchase smaller ones.

The advertisement to rent the house started yesterday and we’ve already received a couple of inquiries, no appointments set yet but at least it’s started!  Here’s a link to the facebook photo album I created for the photos we selected to use for advertisement.  You’ve probably seen them all but now they are in one place.

https://www.facebook.com/rosalyn.chauvin/media_set?set=a.10101389745361454.1073741840.50313942&type=3

Ya’ll come back now, ya hear!

isaiah 55 10 11

cooltext1838781539

Click on the links below to go there!

Wacky Wonderful Wednesdays published on Wednesdays

Some Things I Learned About Alzheimer’s published on Fridays

03.05.15 Granite counter tops, back splashes and sinks – Ta Da!!

im pretending to be here beach Thursday, March 5, 2015 – Shiver, shiver is all I can say about the weather here today. I’m staying inside the RV as much as possible today!

There is so much going on at the house for the next few days it feels like one of those houses that is built in 7 days!

The granite counter tops for the kitchen and both bathroom and under mount sinks are being installed today. The plumber will install toilets, faucets, etc. tomorrow. The stained concrete crew will remove the covering from the flooring tomorrow also (sealing the floors doesn’t happen prayFriday). Either tomorrow or Saturday the closet shelving guy will be here to take care of that in the closets, pantry and laundry room!

Sure hope each of those crews comes at different times! Let’s see how it goes!

Right now the money is just flowing out.  I checked our construction account and every day two or three sizable checks go through.

Sure hope today is the last day we see this for our flooring!

20150305_143526The counter tops are installed with back splashes and the crown molding for the cabinets is installed too.  When I 11034181_10101388058162614_4800682364405514984_nsaw it all coming in I was so happy.  After only seeing a 4 inch by 4 inch sample piece for so long and not really knowing what the whole thing would look like, I admit I was a little nervous about it.  Just like the stained concrete floors, we’ve not seen it sealed so we haven’t really seen how it will look.

So far all of our choices blend well.  The marble has browns in it that match the pendants and the dark maple cabinets.  It also has some golds that blend well with the walls.  It also has some greys in it that don’t match anything but we like the addition of that in the mix!  The bathroom granite has more black spots that go great with the espresso (black) cabinets and medicine cabinets.

Here’s pictures from throughout the process today!

e5
Guest bathroom granite counter top and under mount oval sink
e7
Installers holding up the main sink piece of granite
e9
Kitchen counter tops just laying there!

e10

Beveled edge of the 3 cm kitchen counter top we got in place of the bull nose 2 cm top.

Roy purchased Levolor horizontal white wood blinds for all the windows and is installing them as I am writing. Here are pictures of one finished and one he’s just started on.

20150305_16060820150305_161348It’s 4:30 and I’m going to wrap today’s post up.  More pictures tomorrow from when they finish the counter tops today.

Ya’ll come back now, ya hear!

2 corinthians 5 17

cooltext1838781539

Click on the links below to go there!

Wacky Wonderful Wednesdays published on Wednesdays

Some Things I Learned About Alzheimer’s published on Fridays

03.04.15 Part Two – The cabinets arrived a day early, porch railings and microwave!

z2High temperatures here in Amite on Thursdays was 81.  High temperature on Friday will be in the low 40s.  Wish it would level off somewhere in between for a while!

Wednesday, March 4, 2015 – We were having a hard time getting the cabinet/counter top folks to commit to Thursday for delivery and installation.  They surprised us by bringing the cabinets on Wednesday.  That was a BIG surprise and the electrician was just finishing up so we scrambled to clean up and get the space ready for the kitchen cabinets and the two bathroom cabinets to go in.  The electricians and cabinet men finished their work Wednesday evening and these pictures are from then. The cabinet men did not have the crown molding for top of cabinets so the counter top men will bring that Thursday.

20150304_115344
Espresso cabinets for both bathrooms
20150304_115853
Family room full of cabinets and the electricians finishing up.
20150304_130928
Cabinet installers working in the kitchen
20150304_130947
Light fixture in master bathroom
20150304_131210
Pendants over kitchen bar
20150304_174815
Dark Carmel kitchen cabinets installed up close

20150304_15004720150304_164519 20150304_164717   20150304_164947 Late this afternoon Roy and I installed the microwave oven!  It’s the same design and brand as all the other kitchen appliances.  Here’s a look!

20150304_174022 20150304_174901On Thursday the granite counter tops will be delivered and installed. The finishing plumbing items: toilets, fixtures, etc. will be delivered Thursday and installed Friday.

What we have left to finish the house is:
Toilets, sinks and tubs all hooked up to water – Friday
Install closet shelving in closets, laundry room and pantry – Friday/Saturday
Air Conditioning outside unit installed – Monday
Pick up of porta potty – yeah!!! – Monday

Some time next week:
Stained concrete floors sealed and fleur de lis installed
Appliances delivered and installed
Underground electrical service to the house
Permanent electricity to house hooked up with meter installed
Trim work completed – after cabinets are installed
Paint touched up
Final grading of land including filling in around and on top of the back culvert and additional gravel in several places
Planting bushes around house

We should be ready for someone to move in around March 15th.  I’m going to start advertising it tomorrow as soon as I have pictures of the kitchen with counter tops on!

Ya’ll come back now, ya hear!

1 john 1 9

cooltext1838781539

Click on the links below to go there!

Wacky Wonderful Wednesdays published on Wednesdays

Some Things I Learned About Alzheimer’s published on Fridays

03.04.15 Light fixtures – yipee! BIG SURPRISE NEWS and HAPPY 6TH BIRTHDAY MADISYN

our days are for his praise Tuesday, March 3, 2015 My job today was to clean the exterior doors and to scrape and clean all the windows inside and out.  For once I’m glad we only have 7 windows!   I was surprised to find not much sheet rock and paint on the windows but they were nasty so they got a good cleaning.  Each ifyoure going to rise you might as well shinewindow took at least 4 cleanings and will probably need another before the house construction is finished.

Roy’s job was to sweep out the house, finish up installing the exterior door locks, and place all the boxes of light fixtures in the correct room.  He laid them out, along with enough bulbs for each fixture. I can’t wait till they are all installed!

 20150303_121436 20150303_121444THEN he started shoveling more mud which he says was going to end up in the pond but he wanted to shore up the entry to the culvert, just in case another flood occurs before he implements Plan B.  He explained Plan B to me but I think we’ll wait and let pictures describe it when it happens.

20150303_132234Wednesday, March 4, 2015 – Madisyn Ann Chauvin’s 6th birthday has arrived!  We won’t see her today but I’m sure the day will be filled with specialness for her!  HAPPY BIRTHDAY MADISYN!

Our electrician, Jerry Joiner, and his helper are here today installing the light fixtures.  Here’s some early morning pictures of their progress.

20150304_09295820150304_093130 20150304_093102 20150304_093051 20150304_093023  Later in the day I checked in on Jerry and these pictures are of the rest of the fixtures installed.

20150304_115318
All closets, pantry and laundry room have these LED lights
20150304_115325
Round LED light for kitchen
20150304_115402
1 of 5 smoke detectors
20150304_115411
Kitchen bar pendant lights and kitchen LED light

Even though I don’t have pictures of the bathroom light fixtures yet (and they are my favorite fixtures), I am wrapping up this blog post because you’ll be reading for days if I shared the BIG SURPRISE NEWS for the day in this one.  Check back next time to find out!

Ya’ll come back now, ya hear!

1 corinthians 2 9

cooltext1838781539

Click on the links below to go there!

Wacky Wonderful Wednesdays published on Wednesdays

Some Things I Learned About Alzheimer’s published on Fridays

03.01.15 Birthday Happy to Madisyn!

west2Sunday, March 1, 2015 – Grannie and Paw Paw were called in to keep Madisyn over night so her mom, dad and Kim could decorate and get everything ready for her 6th birthday party.  So we played, snuggled, slept and took her to church with us.

We played outside while there was still light on Saturday.  I also took pictures of the newly cleared area on our land next to the pond. Now that Roy’s built a partial bridge over the culvert he was able to ride the lawnmower over there and cut back a lot of brush.

b1 b2 b4This is a close up of one of our medicine cabinets.  It has beveled glass on the front, a beautiful black frame and mirrored insides with glass shelves.

b7A look at the fresh paint job from the living room into the kitchen.  They will be back Monday to finish things up. b6 Here Madisyn is with several other children during the special children’s time in the worship service with our pastor Dr. Randy Davis.

20150301_110833Next are pictures of her “Under the Sea” Ariel birthday party at our son Chip, her daddy’s, home.  There were a lot of wonderful under the sea decorations and delicious food outside but I somehow didn’t take one picture of that. 20150301_133300 20150301_133310 20150301_134704  20150301_134849 20150301_151140   20150301_152035This ends our Birthday Happy celebration for sweet Madisyn!  This has probably been the first day we did not go into the house once.  When we returned this evening both of us crashed for at least two hours.  We’re watching our favorite show “Once Upon A Time” and then going to crash again.  Take a lot for two old folks to recover from a 6 year old’s birthday party!

Ya’ll come back now, ya’ hear

psalm 121

cooltext1838781539

Click on the links below to go there!

Wacky Wonderful Wednesdays published on Wednesdays

Some Things I Learned About Alzheimer’s published on Fridays

02.28.2015 Painting and visiting!!

relaxing saturdaySaturday, February 28, 2015 – Bye Bye February!  Tomorrow we will welcome in the month of March, one of my favorite months because of new flower blossoms, new leaves on trees and more 70 degree days!

Our painting trio are back today making great progress.

20150228_123311 20150228_123327  20150228_123402 20150228_123413 20150228_123557Got a call from the counter top people that the counter top we chose was unavailable.  It was suppose to be put aside for us when we gave them the deposit three weeks ago but it wasn’t.  However they offered to give us 3 cm granite in the same design instead of the lesser expensive 2 cm granite we chose at the 2 cm price!!!  The 3 cm is available in a beveled edge instead of the bull nose edge.  That’s okay too!  We are hopeful the cabinets and counter tops will begrowing old together installed next Thursday.

My sister Harriett and Brother in law George are on their way to see us right now.  Then Madisyn will be here over night so I am trying to finish this before all the fun begins!

Madisyn is staying the night with us tonight and going to church with us tomorrow so that mommy, daddy and Kim have time to decorate and get everything prepared for her birthday part tomorrow.  Plus it will make it all a surprise for her when she sees it tomorrow for the first time.  It is absolutely wonderful to see the three adults working together on something benefiting Madisyn.  The little girl deserves that and I am proud of all three of them for making this happen.

Ya’ll come back now, ya’ hear!

phlippians 4 7

cooltext1838781539

Click on the links below to go there!

Wacky Wonderful Wednesdays published on Wednesdays

Some Things I Learned About Alzheimer’s published on Fridays

 

02.27.15 Building a house is a piece of cake!

734401_833048396710692_1983591327_nWell this is the second time writing today’s blog.  The first one was finished complete with pictures and it disappeared.  Sure hope I remember everything I wrote in that one, it was good!

Friday, February 27, 2015 – Yep, building a house is a piece of cake, with the right contractor and subcontractors that is!  After a slow start due to holidays, rains, and other delays our house has gone up fast.  We are now within a week or two of the house being completed!! Thanks to Ronnie Glover, Cory Glover and all our subs!

A really nice and friendly trio of painters were at the house bright and early and started by prepping everything by filling nail holes and caulking corners and edges.  As we left I can hear them in the house spraying the ceilings!!!!! Here’s a couple of pics of their earlier work.

c10 c9We took Dora (our RV) to Amite to fill her up with propane.  We also stopped at the gas station to fill up with diesel while it is still $2.39 a gallon. Dora’s now full and happy. We also stopped at Walmart to pick up 5 items and came out1016835_1100500646642875_783139052894355040_n with 50. Just wanted fruit to make a fruit tray for Madisyn’s birthday party but we wound up buying almost enough food for us for a week. I’ve been having trouble finding our truck when I go shopping but today Dora in all her big glory was there for me to easily find!

Had a wonderful phone visit on a dear friend, Pat Turner, whose husband Bill died of Alzheimer’s and her neighbor was just diagnosed. I believe she is going to share my Alzheimer’s blog with the husband, who is very new to all this. If you know of someone my blog would help please share this link with them. https://rosalynsalzheimersblog.wordpress.com/

1377629_609944762377739_2100035853_nWhen we came home from our trip to town the painters were leaving for the day. They painted all the doors, all the ceilings and the walls in the master bedroom, closet and bath. I was so tickled to see color on the walls. They will be back tomorrow and can’t wait to see it finished! Here’s pictures of today’s painting.  Roy and I really like painting the ceiling the same color as the walls and you can see that here.  The ceilings still look lighter even though they are the same color.

c11 c7 c4  c6We didn’t think the living room and kitchen ceilings were painted until we moved around some and could tell it was.  The last picture above shows this.

Our vinyl man, Floyd Fayard came this afternoon to finish caulking the work he did last week.  I showed him the new bench Roy made for down by the pond since Roy used the ends of the front porch columns to make the bench legs from.  Here’s pictures of the bench.

c3  c1Ya’ll come back now, ya’ hear!

400650_696278970423607_119254271_ncooltext1838781539

Click on the links below to go there!

Wacky Wonderful Wednesdays published on Wednesdays

Some Things I Learned About Alzheimer’s published on Fridays

 

02.25.15 Interior doors, trim work and remaining work list

wednesday blessingsWednesday, February 25, 2015 – The ceiling was insulated this morning – no pictures of that!

The trim man and our contractor, Ronnie, were here early too!  I didn’t go over to the house until noon, it is way too cold and rainy. When I did I was amazed to see all the doors hung, the attic stairs installed and the window seats installed.  Still needs baseboards and crown moulding and the living room window framing isn’t finished.  It is wonderful to see the finishing touches starting now.  I love the doors we chose.  They are not the regular rectangular shaped panels but have a more country feel to them.

None of the doors or trim work are painted yet.  The color of the doors now look light grey but they will all be white when painted. Painting will start tomorrow – goody, goody!  Hopefully by Monday it will all be painted and the other finishing items will go in next week and the following week.

20150225_120410
Guest bedroom closet and entrance door
20150225_120349
Attic stairs
20150225_120451
0Guest bedroom closets
20150225_120525
Mr. Joe cutting trim on the front porch
20150225_120506
Bedroom door
20150225_120624
Living room window – trim not finished
20150225_120736
Pantry door on the left and laundry doors on the right – Little Joe in front!

We still have a whole page of items to be completed before it’s totally complete but we’re very close.For those who are in the midst of construction or are considering it and are wondering what’s left here’s the list, not necessarily in the order they have to be done:

Stained concrete floors sealed and fleur de lis installedcheck list
Interior painting
Install cabinets in granite counter tops in kitchen
Install cabinets and granite vanity top in bathrooms
Install closet shelving in closets, laundry room and pantry
Electrical fixtures installed
Underground electrical service to the house
Permanent electricity to house hooked up with meter installed
Outside air condition unit installed and hooked up
Toilets, sinks and tubs all hooked up to watergeting things done
Pick up of porta potty – yeah!!!
Medicine cabinets installed
Trim work completed – after cabinets are installed
Final grading of land including filling in around and on top of the culvert and additional gravel in several places
Planting bushes around house

These are exciting times in our house construction.  If you’d like to come visit and check it out, please do.   Any day (except Sunday all day this week) any time.  We’re here and would love to show you our cute cottage before it’s occupied and we can’t!

Just got the call from the Roseland Permit Office that our septic system passed inspection and I can get our permit showing it’s completed!

Tuesday, February 26, 2015 – Our electrician came back today to do some more work.  The cabinet/counter top rep came to take final measurements now that the sheet rock is completely finished.  The trim man finished his work this morning putting up the crown molding and window trim.   That’s it for Thursday’s construction.  Painting will start Friday!!!

Ya’ll come back now, ya’ hear!